How do we work?

dervus

01 ARCHITECTURE

Selection of a ready-made architectural concept of a house from the project catalogue

Architectural projects from the catalogue were developed by our partners — architectural bureaus — on the MVS technology considering optimization of transport costs and installation time. We also considered the communication networks, including the ventilation lines and equipment. Every project can be adapted to the conditions of a particular site, local regulations and customer requirements.

Download design catalogue

Custom architecture development based on МVS

Our partners — architectural bureaus — can develop custom projects in MVS technology according to the customer’s wishes in cooperation with the engineering department of our company. The project can be developed considering the decorative finishing works, actual furniture and electrical goods and include preliminary calculation of heat losses, electrical energy consumption, lighting etc.

Start
dervus

02 STRUCTURES

Selection of available enclosing structure options

We are ready to offer you various options for walls, roofing pies and flooring developed by our engineering department. The structures may have different thermophysical properties, sound absorption and finish materials.

Request

Development of individual structural pies and finish materials

We can also develop individual structural pies for a special customer requirement. In individual development our experts follow the applicable rules and regulations of governmental authorities and producers of the materials used.

Request
dervus

03 ENGINEERING SOLUTIONS

Selection of available finishing and engineering solutions

Supply and exhaust ventilation systems with heat recuperation, electric drives for regulation of window blinds and shutters, intrusion prevention systems, systems for automation of electric power supply, water supply, heating and cooling: this is not an exhaustive list of the solutions that we can offer as a basic house delivery option.

Request

Development of custom solutions

To fit your needs our engineering department may develop such custom engineering solutions as remote monitoring, automation, video surveillance, mist cooling systems etc.

Request
dervus

04 DOCUMENTATION

Document preparation for commencement of on-site construction

Our partners prepare all the necessary documentation and permissions for commencement of construction works with due consideration of the local governmental requirements and construction regulations.

Document preparation for financing of house production at Dervus factory

Based on the developed design documents an agreement is concluded with Dervus factory in which the finance terms and delivery of a house is specified. The agreement will also specify the complete house unit and equipment supplied separately by partners directly to the construction site.

dervus

05 PRODUCTION AT DERVUS FACTORY

MVS means that the production of a home (building) takes place under controlled factory conditions, in separate sections, with complete interior and exterior finish (readiness level up to 95%). The house sections are produced in dimensions that allow further transportation of these structures by road transport and their quick assembly into a house unit on the construction site.

Link to video
dervus

06 CONSTRUCTION SITE PREPARATION

The construction site is equipped with all the required technologies, scaffolding and a WC. The freight transport access routes are studied by partners of Dervus.

Creation of the foundation or basement, connection of external communications to the building access points, arrangement and maintenance of pedestrian footpaths, boards and external steps, arrangement of drainage systems and grounding are implemented by the partners of Dervus.

Become a partner
dervus

07 DELIVERY AND INSTALLATION OF THE PREFABRICATED HOME

The parts of the house are delivered by road transport.

It is the responsibility of Dervus to search for transport and organize delivery to the site of installation.

Crane equipment is used for installation purposes. The whole installation process, including full finish and furniture, usually takes 2 weeks maximum.

Customs clearance, unloading and installation are performed by the partners of Dervus.

Become a partner
dervus

08 HOUSE COMMISSIONING

House leakage test, certification and registration for maintenance service are performed by the partners of Dervus.

Every house is equipped with a system for remote monitoring of temperature and humidity in the enclosing structures and a carbon dioxide indicator in living rooms. The Dervus engineering department performs the monitoring in order to promptly notify the maintenance department and help to rectify the problems if values exceeding the threshold level are detected.

Become a partner

Wall and floor cross-sections (pies)

  • Mineral facade
  • Wooden facade
  • Facade fiber cement
  • Facing clinker
dervus
01 Silicone Facade Plaster Yes
02 Adhesive – reinforcing mixture Yes
03 Heat-insulation slab Mineral wool
04 Wind Barrier Gypsum Board Yes
05 Wooden frame with insulation 198mm
06 Steam brake PE-Foile
07 Wooden frame with insulation 48 mm
08 Gypsum Board 25mm
390 mm
TOTAL WALL THICKNESS
0.12 W/(m²·K)
HEAT TRANSFER COEFFICIENT (U)
dervus
01 Wooden Boarding Impregnated
02 Wooden Laths Yes
03 Wind protection membrane Yes
04 Wooden frame with insulation 100mm
04 Wind Barrier Gypsum Board Yes
05 Wooden frame with insulation 198mm
06 Steam brake PE-Foile
07 Wooden frame with insulation 48 mm
08 Gypsum Board 25mm
440 mm
TOTAL WALL THICKNESS
0.12 W/(m²·K)
HEAT TRANSFER COEFFICIENT (U)
dervus
01 Fiber Cement Cladding
02 Wooden Laths Yes
03 Wind protection membrane Yes
04 Wooden frame with insulation 100mm
04 Wind Barrier Gypsum Board Yes
05 Wooden frame with insulation 198mm
06 Steam brake PE-Foile
07 Wooden frame with insulation 48 mm
08 Gypsum Board 25mm
430 mm
TOTAL WALL THICKNESS
0.12 W/(m²·K)
HEAT TRANSFER COEFFICIENT (U)
dervus
01 Clinker tiles Yes
02 Adhesive – reinforcing mixture Yes
03 Fiber Cement Cladding
03 Wind protection membrane Yes
04 Wooden frame with insulation 100mm
04 Wind Barrier Gypsum Board Yes
05 Wooden frame with insulation 198mm
06 Steam brake PE-Foile
07 Wooden frame with insulation 48 mm
08 Gypsum Board 25mm
450 mm
TOTAL WALL THICKNESS
0.12 W/(m²·K)
HEAT TRANSFER COEFFICIENT (U)

Build With Us

Would love to discuss working with you on your next projects

get started

Download
projects
catalog

Contact us






    Acquainted with and agrees to the Privacy Policy.

    Dervus Design uses in order to give you the best possible experience on our website. By continuing to use this site, you agree to our use of cookies.
    Privacy Policy

    Accept