Property Type | Residential |
Subtype | Single Family |
Total area | 105.6 м² |
External dimensions | 7.32 х 11.39 м |
Built-Up Area | 79.60 м² |
Roof slope | 15° |
Room | 5 |
WC | 2 |
Garage/Carport | Option |
UNDER INTERNAL FINISHING | TURNKEY PROJECT |
|
Exterior and interior walls in accordance with the selected project | ||
Facade according to the selected project |
UNDER INTERNAL FINISHING | TURNKEY PROJECT |
|
Attic and roof works, water drainage system | ||
All roof shapes are possible (pitched, hip, flat) | ||
Attic staircase |
UNDER INTERNAL FINISHING | TURNKEY PROJECT |
|
Putty of walls and ceilings in Q3 quality | an option | |
Painting walls and ceilings in Q3 quality | an option | |
Wall tiles in the bathroom and toilet | an option | |
Floor tiles in the bathroom, toilet, hallway | an option | |
Laminate flooring in the living rooms | an option | |
Parquet floors in living rooms | an option | an option |
Wooden staircase |
UNDER INTERNAL FINISHING | TURNKEY PROJECT |
|
Gelolite window sills (inside) and aluminum (outside) | ||
Entrance door with multi-point lock and security lock | ||
Windows, patio doors made of white plastic | ||
Windows, interior doors made of other materials (aluminum, wood, wood / aluminum) | an option | an option |
Interior doors in white, including accessories | an option |
UNDER INTERNAL FINISHING | TURNKEY PROJECT |
|
Kitchen with electrical equipment | an option | |
Bathroom Furniture Set | an option |
UNDER INTERNAL FINISHING | TURNKEY PROJECT |
|
Electrical installations (switches, sockets, FI-switches, circuit breakers, including wiring) | ||
Sanitary wiring (connecting hot and cold water, sewage, toilet installation for suspended) | ||
Sanitary equipment (washbasin, shower tray, bathtub, toilet bowl, in accordance with the selected project) | an option |
UNDER INTERNAL FINISHING | TURNKEY PROJECT |
|
Heat pump | an option | |
Heat distribution with underfloor heating | ||
Gas boiler (including hot water heating) | an option | an option |
Heat recovery ventilation | an option | an option |
Surface cooling with reversible heat pump | an option | an option |
UNDER INTERNAL FINISHING | TURNKEY PROJECT |
|
Strip foundation | an option | an option |
Basement in use | an option | an option |
UNDER INTERNAL FINISHING | TURNKEY PROJECT |
|
Transportation (Vienna) | ||
Import VAT | ||
House assembly, including protective scaffolding |